Skip to content

FAQ

How cabinet lifts improve data-centre efficiency

One technician, no deracking, no four-person circus. Labour avoided is $59,160 CAD a year on the catalogue comparison — before injury, delayed turn-ups, or damaged hardware.

Canadian made · Canadian edition · 2025-11-17

Downtime is expensive. Crews are expensive. Pulling every server to roll an empty cabinet is the slow, dangerous method. A pair of RL3500S or RL5000S units turns a relocation into a single-technician job: strap, lift, roll, set.

These are not warehouse jacks. They are specified for 42-inch aisles, raised floors, and live Canadian halls — hyperscale, colo, enterprise, government, CRAC, UPS, and modular PODs.

What actually changes

  • Zero-disassembly moves. The cabinet stays populated. Power supplies stay in. Network integrity stays put.
  • Labour. Catalogue comparison: four-person crew $65,280 CAD a year versus one technician + RackLift $6,120 CAD. Labour avoided $59,160 CAD — not including injury, delayed turn-ups, or damaged hardware.
  • Crew size. Staffing is tight. The machine holds the load so engineers are not the crane.
  • Aisle geometry. Compact 704-aluminum frames spin where a stacker will not.
  • Time. A loaded cabinet off the tiles in minutes, not a day of deracking.

Pick the unit to the job

  • RL3500S — manual, built in Markham and Belleville, when the hall wants a crank and a lock.
  • RL5000S — battery-electric, same capacity, when the hall wants a switch.

Warehouse stackers mark tiles, miss insertion height, and fail a two-tile spin. Using people to lift cabinets is the expensive part.

Adapted for Canada from the RackLift briefing. Original: racklift.com.